|

Rockwood
Corporation is rapidly developing a reputation as the “go to” company
for difficult tank jacking and relocation projects.
Our group brings
to Rockwood Corporation many years of heavy rigging and construction
experience. Knowledge of heavy crane lifts on lock and bridge
projects combined with millwright experience has given birth to the
lifting and moving of steel tanks. With welding and concrete
experience we have the unique ability to perform this task with
efficiency and competence.
Each jacking job
is unique and includes the following careful considerations:
-
Evaluation of
existing soil conditions.
-
Foundation
design including possible reinforcement.
-
Design of
additional rings.
-
Calculation of
jack system requirements. Consideration given to standpipe or reservoir
configuration. Wind resistance is also evaluated and planned.
-
Coatings are
specified.
Not all tanks are good
candidates for jacking. Let Rockwood Corporation perform a
feasibility study at no cost or select a more in depth P.E. evaluation
including preliminary foundation and steel ring sizing. This option is
useful in preparation for bidding.

|